Testimonials

City Care

The construction works were undertaken in full view of the travelling public and this required a high level of tidiness and planning that CDL demonstated.

CDL completed the pipe installation efficiently with minimal disruption and no impact on the environment. They have the technical personnel, plant, machinery and other resources to successfully complete a challenging project.

Download full testimonial

Fulton Hogan

UUL demonstrated a high level of technical competence throughout the project and proved to be well-resourced, technically innovative and professional to deal with. UUL's competence and ability to achieve cost-efficient installation in the poor soil conditions encountered resulted in Fulton Hogan extending the quantity of directional drilling beyond the original scope of works, to include areas scheduled for installation by open cut.

Download full testimonial

Energyworks Ltd

UUL have performed exceptionally well for us.

It is a pleasure to deal with Neil and Tim and their staff and we have no hesitation in recommending them to others.

Download full testimonial